Which CIBSE Guide Should You Use? A Practical HVAC Design Map
Match the reference to the decision, keep its edition and limitations visible, and pass the right heat duty from the room calculation to each item of equipment.
Published by MEPFlow · Methods and limitations · Primary references
Keep calculation assumptions visible
Explore MEPFlow’s supported load, duct and hydronic workflows. Check the stated methods and outputs against your project brief; this guide does not establish CIBSE certification or compliance.
In this guide: jump to a step
A designer can cite the right handbook and still hand the wrong number to the next person. A room heat loss, an outdoor-air coil duty and a plant load answer different questions. The reference is useful only when the calculation boundary, inputs and intended output travel with it.
CIBSE, the Chartered Institution of Building Services Engineers, publishes guides covering environmental design, system design, reference data, controls and maintenance. For a practical HVAC project, start with the decision you need to make, then identify the relevant guide and the evidence you must keep.
This article is an original reference-selection and design-handoff workflow. It uses public CIBSE catalog information checked on 6 November 2026, plus an independently checked teaching example. It does not reproduce handbook tables or substitute for access to the applicable chapters, project specifications or local regulations.
Explore the supported workflow in MEPFlow’s Explore the HVAC design workflow. Check the method, current scope and example outputs against your project requirements.
1. Start with the project decision and jurisdiction
Write the question in plain language before choosing the book: What indoor conditions are required? How much heat is needed? Which system supplies it? What data support the pressure-loss calculation? How will the controls respond? What must the operator be able to inspect and maintain? These questions lead to different references and different deliverables.
The official CIBSE Guides index is a useful starting point, but a guide letter is not a complete specification. Record the title, edition, chapter or section, applicable corrections and the reason it is relevant. A later website update does not necessarily mean the handbook has a new edition.
Check the governing requirements separately. On a Canadian project, establish the applicable provincial or territorial requirements, adopted standards, local design conditions and authority expectations. On a UK project, establish the requirements for the relevant nation and project. Do not import a climate value, ventilation rate or compliance method simply because it appears in a familiar reference.
Then agree who owns each decision. A proposed internal temperature, occupancy or operating schedule may need client or specialist input. Mark an unresolved input as provisional, with an owner and a consequence, rather than hiding it inside a completed calculation.
Original project workflow
A short chain that another designer can follow
Decision
What are we deciding?
State the room, system boundary and required output.
Evidence
Why is this input valid?
Name the reference, edition, section and project assumption.
Handoff
Who uses this result?
Attach units, exclusions, revision and the next check.
2. Match A, B, C, H and M to the work
The map below selects references for a typical HVAC design task rather than cataloging every CIBSE publication. Guide B is split into parts. For heating and ventilation work, B1 and B2 are more useful identifiers than “Guide B” alone. For cooling, acoustics or another specialist question, use the official index to identify the relevant part and verify its scope.
Guide A covers environmental design and includes design criteria, building fabric, heating and ventilation sizing, and calculation-quality considerations. B1 addresses heating systems, while B2 addresses ventilation and ductwork. Guide C supplies reference data across subjects such as humid air, water, heat transfer and fluid flow. Use their actual chapters to establish the applicable method and limits.
Be particularly careful with Guide H. Its catalog entry is marked Active, but CIBSE also warns that a summer 2018 review found some content out of date. Treat it as a controls reference that needs a current applicability check, not as an automatic specification for modern equipment or control protocols. Guide M 2023 connects design decisions to maintenance, commissioning, handover and operating information.
| Decision | Reference and listed edition | Useful handoff |
|---|---|---|
| Set design criteria and calculate environmental loads | Guide A: Environmental Design, 2015; catalog title notes updated 2021 | Agreed criteria, input sources, room/system boundaries and calculation record |
| Develop the heating system | Guide B1: Heating, 2016 | System arrangement, equipment duties, operating temperatures and selection checks |
| Develop ventilation and ductwork | Guide B2: Ventilation and Ductwork, 2016 | Airflow basis, air path, duct network and equipment pressure requirements |
| Check physical data and calculation inputs | Guide C: Reference Data, 2007 | Property value with units, temperature, composition and applicable method |
| Define control intent | Guide H: Building Control Systems, 2009; explicit age warning | Reviewed sequence, sensor locations, operating modes and verification plan |
| Plan for operation and maintenance | Guide M: Maintenance Engineering and Management, 2023, third edition | Access requirements, commissioning evidence, asset information and handover responsibilities |
Check corrections as well as the cover date
The B2 catalog identifies May 2018 corrections. Guide C lists corrections through July 2016 and a later spreadsheet-instructions update. Those are not new handbook editions. The Guide M page lists a November 2023 v1.4 correction. Record the applicable corrected material in your project reference register.
Keep calculation assumptions visible
Explore MEPFlow’s supported load, duct and hydronic workflows. Check the stated methods and outputs against your project brief; this guide does not establish CIBSE certification or compliance.
Start free trial3. Keep a small reference and assumption register
A useful register connects one input or decision to the evidence supporting it. “Calculated to CIBSE” is too broad to reconstruct a result. Record the actual section consulted, the value used, the units, the reason it applies and the calculation revision. If a manufacturer value is required, identify the selected product and rating conditions as well.
The table shows a compact original template. Keep project facts separate from reference values and designer assumptions. For example, a client-agreed room temperature has a different source from a fluid property or a coil performance rating. Do not fill an empty citation with an unrelated handbook link.
Use a status such as confirmed, provisional or superseded. When the room schedule changes, it should be possible to find the calculations and equipment affected without rereading every report. A register with a few maintained fields is more valuable than a long document that nobody updates.
| Record | What to keep | Why it matters |
|---|---|---|
| Requirement | Space, operating mode, jurisdiction and approved criterion | Establishes what the design must achieve |
| Reference | Title, edition, correction, actual section and access date | Makes the chosen basis recoverable |
| Input | Value, units, source, conditions and provisional/confirmed status | Separates measured or agreed data from assumptions |
| Boundary | Equipment or space included; excluded terms and interfaces | Prevents omissions and double counting |
| Output | Duty or flow with units, calculation revision and receiving person/system | Preserves the meaning of the number |
| Change | Old value, new value, reason, affected checks and reviewer | Shows which downstream decisions need reopening |
4. Worked example: decide which equipment supplies the heat
Consider an invented room at 20°C with outdoor air at −5°C. Its assumed fabric heat-loss coefficient is 96 W/K. That coefficient is the total conductance used for this example, not a recommended value for a real room. The fabric duty is 96 × 25 = 2,400 W.
Assume 60 L/s of outdoor air, air density 1.20 kg/m³ and specific heat 1,005 J/(kg·K). Convert the airflow to 0.060 m³/s. Heating that air through 25 K requires 1.20 × 1,005 × 0.060 × 25 = 1,809 W. The airflow is an invented teaching input, not an approved ventilation rate.
Case A delivers the outdoor air untreated at −5°C as a teaching contrast, not a recommended supply-air or comfort strategy. In this simplified balance, the room terminal must provide 2,400 + 1,809 = 4,209 W. Case B heats the same air centrally to the room temperature of 20°C. The central coil then provides 1,809 W, and the room terminal provides 2,400 W. The combined useful heating duty is still 4,209 W.
Air is assumed to leave the room at 20°C, with no heat recovery. The example excludes infiltration, thermal storage, warm-up, internal and solar gains, latent loads, fan heat and distribution losses. It demonstrates equipment ownership of two heat terms, not complete room or plant sizing. If supply air is cooler or warmer than the room, its contribution must be included in the room balance.
Keep the heat duty with the equipment that provides it
Original partial sensible-heating example. The blue segment is room-terminal heat. The orange segment is central outdoor-air coil heat. Values are labelled, and the horizontal scale begins at zero.
Scroll sideways to read the diagram and chart.
Air heat duty = ρair × cpair × qair × ΔTair
Density in kg/m³ × specific heat in J/(kg·K) × volume flow in m³/s × temperature difference in K gives watts. A temperature difference of 25°C is 25 K; do not add 273.15 to a temperature difference.
Do not assign the same outdoor-air heat twice
In case B, putting the full 4.209 kW into the room terminal and also retaining the 1.809 kW central coil would count the outdoor-air heat twice. Keep the thermal boundaries explicit before selecting equipment.
5. Pass terminal duty to water flow, not the whole-system total
Now suppose each relevant heating coil uses water, with an assumed density of 1,000 kg/m³, specific heat of 4,180 J/(kg·K), and a 10 K design water temperature drop. These constant properties are rounded teaching assumptions. Real selection should use properties appropriate to the fluid composition and operating temperature, including any glycol.
For case A, the terminal volume flow is 4,209 ÷ (1,000 × 4,180 × 10) = 0.000100694 m³/s, or 0.100694 L/s. For case B, the terminal flow falls to 0.057416 L/s because its duty is only 2,400 W. If the central coil is also hydronic at the same 10 K drop, its separate flow is 0.043278 L/s.
The two case B flows add to the case A flow only because the example assumes the same fluid, water temperature drop and simultaneous duty for both coils. That arithmetic is not a pump or pipe selection. Actual terminal capacity depends on the entering water and air conditions, flow and manufacturer rating. Network head requires a separate complete-circuit calculation.
For the underlying methods, use the existing room heat-loss guide, hydronic flow and pipe-sizing guide and critical-circuit pump-head guide. This article focuses on the record that connects those calculations.
Water volume flow = heat duty ÷ (ρwater × cpwater × ΔTwater)
With heat duty in W, density in kg/m³ and specific heat in J/(kg·K), the result is m³/s. Multiply by 1,000 for L/s. Use the duty assigned to the particular coil or terminal.
| Case | Outdoor air / room supply | Room terminal | Central air coil | Combined duty |
|---|---|---|---|---|
| A: untreated air | 60 L/s / −5°C | 4.209 kW; 0.100694 L/s water | 0 kW; 0 L/s water | 4.209 kW |
| B: tempered air | 60 L/s / 20°C | 2.400 kW; 0.057416 L/s water | 1.809 kW; 0.043278 L/s water | 4.209 kW |
| C: revised tempered air | 80 L/s / 20°C | 2.400 kW; 0.057416 L/s water | 2.412 kW; 0.057703 L/s water | 4.812 kW |
6. Use a revision to test the handoff
In case C, a hypothetical revision increases outdoor airflow from 60 to 80 L/s. The central system still supplies it at 20°C. The central coil duty becomes 1.20 × 1,005 × 0.080 × 25 = 2,412 W, an increase of 603 W. The fabric duty stays at 2,400 W. Because the air still arrives at room temperature, the room-terminal duty stays at 2,400 W in this simplified balance.
The useful heating total rises from 4,209 to 4,812 W, about 14.3%. The central coil duty rises by one-third. A single percentage applied to every downstream result would therefore be wrong. The room terminal does not change in this example, while the central coil and outdoor-air distribution do.
Issue the revision to the people checking the air-handling unit, duct sizes, pressure losses, hydronic branch, controls and electrical implications. Check the consequences rather than assuming each selected item must grow. An existing component may have sufficient capacity, but that needs evidence. Keep the old result as superseded and show which checks have been completed.
Download the worked heat-handoff CSV to inspect the unrounded arithmetic, and the reference-register template to structure your own review. The files are free, fixed-value teaching aids without embedded formulas or macros. Replace the assumptions with verified project data and independently check your calculation method.
1.Identify the changed source
Record what changed, who confirmed it and the date. Do not silently overwrite a design input.
2.Find the affected boundaries
In this example the central outdoor-air duty changes, while the room fabric and terminal duty remain unchanged.
3.Recheck selections and controls
Confirm equipment ratings, flow paths, pressure requirements and the operating sequence at the revised condition.
4.Close the record
Link the revised calculation, drawing and selection evidence, and name the reviewer who accepted the handoff.
7. Carry controls and maintenance into the same record
An assumed 20°C outdoor-air supply is an operating requirement, not something a heat-balance equation makes happen. The controls record should explain how the system maintains that condition, where it measures temperature and how it responds to operating modes and faults. Frost protection, plant availability and safety interlocks need design for the actual equipment and conditions.
The age warning on Guide H is a reason to verify current controls requirements, manufacturer instructions and project standards before writing the sequence. Do not infer that an Active catalog label makes every protocol or recommendation current. Involve the controls designer and commissioning team where their decisions affect the load boundary.
Guide M 2023 has sections on designers, controls, commissioning, handover and operation-and-maintenance documentation. Use that broader operating view early enough to influence the layout. Leave space to reach filters, actuators, sensors and isolation devices; identify what must be measured to verify the intended duty.
For the example, a useful handover connects the room and central-coil duties to the airflow setpoint, supply-temperature target, coil rating, water-flow requirement and measurement plan. It also records the conditions under which the numbers apply. A table of equipment capacities without those links is difficult to diagnose when the building behaves differently from the calculation.
8. Finish with a reviewable design package
Before issuing, ask another designer to reproduce one important result from the record. Can they find the governing criterion, the exact reference used, the input units, the equipment boundary and the latest revision? Can they explain why a number appears on one equipment schedule but not another? If not, improve the handoff before expanding the calculation.
Use calculation software to keep repeated work manageable, while keeping method selection and engineering review explicit. MEPFlow provides browser-based load, duct and hydronic workflows described on its HVAC design page and methods and limitations page.
CIBSE catalog descriptions support the reference map, but they are not the full technical chapters. Obtain authorized access to the relevant text and check its applicable corrections, calculation limits and relationship to project requirements.
A good final package makes the chain short: a defined requirement, an appropriate reference, a checked calculation, a clearly assigned equipment duty and a controlled revision. That is what lets another person use the design with confidence rather than guess what its numbers mean.
- Confirm the project jurisdiction, criteria, operating conditions and responsible reviewers.
- Record the actual edition, section and corrections used, not only a guide letter.
- Separate room, outdoor-air, system and plant boundaries before combining duties.
- Check units and fluid properties independently; retain unrounded values for the calculation.
- Verify manufacturer ratings, pressure requirements, controls and maintenance access.
- Link changed assumptions to the affected calculations, selections, drawings and handover information.
Frequently asked questions
Which CIBSE guide should I start with for HVAC design?
Start with the decision. Guide A helps frame environmental criteria and load calculations; B1 and B2 address heating and ventilation/ductwork; C supplies reference data; H concerns controls but has an explicit age warning; M supports maintenance and handover. Confirm the actual chapter and current applicability.
Are CIBSE guides the same as building regulations?
No. Establish the governing requirements for the project jurisdiction and the standards or guidance called for by the project. A guide can inform engineering practice, but citing it alone does not establish regulatory compliance.
Does Active status mean every part of a guide is up to date?
No. Read the catalog notices and corrections. Guide H is marked Active while also carrying a warning that some content was found out of date. An edition date, a later correction and a website update mean different things.
Why does the terminal duty change when the same outdoor air is heated centrally?
The heating responsibility moves to different equipment. In the teaching example, a central coil supplies 1.809 kW to bring the outdoor air to room temperature, leaving 2.400 kW of fabric duty for the room terminal. The combined useful heat remains 4.209 kW.
Can I use the worked example to select a heater or pump?
No. It is a partial sensible-energy example with invented assumptions. Real selection requires complete loads, operating conditions, manufacturer performance, distribution and control checks. Pump head also requires the hydraulic circuit, not just the calculated water flow.
Are the CSV files CIBSE calculation spreadsheets?
No. They are original MEPFlow teaching aids: a fixed-value example and a suggested reference-register template. They contain no reproduced CIBSE tables, embedded formulas or macros.
Continue the engineering workflow
Keep calculation assumptions visible
Explore MEPFlow’s supported load, duct and hydronic workflows. Check the stated methods and outputs against your project brief; this guide does not establish CIBSE certification or compliance.
Start free trialPrimary references
Sources and further reading for the methods discussed in this guide.
- CIBSE: Official Guides index
- CIBSE Guide A: Environmental Design (2015, catalog notes updated 2021)
- CIBSE Guide B1: Heating (2016)
- CIBSE Guide B2: Ventilation and Ductwork (2016), including correction notice
- CIBSE Guide C: Reference Data (2007), including correction notices
- CIBSE Guide H: Building Control Systems (2009), including age warning
- CIBSE Guide M: Maintenance Engineering and Management (2023)